Steps for laminate flooring installation (composite flooring)
Many customers do not know how to install laminate flooring after purchasing it. We will provide a detailed introduction
① Preparation before installation
1. Check the ground
-Flatness: Use a 2-meter ruler to check the ground, with a height difference of ≤2 millimeters. Uneven areas need to be leveled with self leveling cement or gypsum. If the height difference is too large, cement sand can be used to re level.
-Drying and cleaning: After self leveling, you should wait for two days to dry (you can cover a part with plastic film to see if there is any water vapor, and wait for the water vapor to disappear without dust or oil stains).
-Rooms in old houses with underfloor heating: The underfloor heating needs to be turned off for 48 hours, and then gradually heated up (≤ 6 ℃/day) 48 hours after installation.In order to better Laminate flooring installation.

2. Tools and materials
-Tools: chainsaw, tapping block, hook, cushion block, tape measure, pencil, square ruler, soundproof pad, etc.
-Auxiliary materials: moisture-proof film (laid on the cushion layer), edge strips (threshold, skirting board), glue (if bonding is required).

3. Floor standing
-Unopened laminate flooring should be left in the installation environment for at least 24 hours to adapt to the installation environment.(The current state is the best laminate flooring and also the flooring with the longest service life)